2015 CHRISTMAS TRAIN DISPLAY
SETTING UP
NOVEMBER 14-22, 2015
Saturday started at 8 AM, loading the rental truck and delivering all the club modules and equipment to the
site.  One of the first projects was to find and install legs on the modules. Then there were measurements to
be made and the modules and track assembled.  By the end of the day, all the modules were connected.
On Sunday, our crew had some module finishing work and track installation to do. The outside track
is using smooth 20-foot diameter curves.  By the end of the day, the first trains were running!
SATURDAY, NOVEMBER 21
By Saturday morning, all the trackwork was done including the yard.  Joe C worked on connecting the feeder
wires under the layout, Robin, Crystal, and Carter worked on the Thomas layout, and Dick, Judy, Dedric,
Jim, Bob D, Lee, Bob H, Jeff, and Joe S worked on detailing modules.  Next job: attaching Plexiglas panels.